• Menu
  • Home
  • Columns
    • Industry News
    • Editorials
    • Now and Then
  • Features
    • Armor
    • Automotive
    • Aviation
    • Figures
    • Ships
    • Space/Sci Fi
    • Special Reports
  • How To
    • Construction
    • Detailing
    • Painting
    • Finishing
  • First Looks
    • Armor
    • Automotive
    • Aviation
    • Figures
    • Ships
    • Space/Sci Fi
  • New Releases
    • Armor
    • Automotive
    • Aviation
    • Figures
    • Ships
    • Space/Sci Fi
    • Book Reviews
    • Tools
  • Gallery
    • Armor
    • Automotive
    • Aviation
    • Figures
    • Ships
    • Space & Sci Fi
    • Drawings
    • References
Internet Modeler : How To: Construction RSS News Feed

Fiat Cr42 Build Sequence

By Stephen Tontoni

Future windscreen 5 min

Wings … drill rigging holes 10 min

Shoot black (interior stuff, wheels, engine, inside wheel wells, bombs, propeller, exhausts, spinner) 15 min

Shoot light gray interior parts (remember sides of fuselage, interior cowls, wheel struts) 15 min

PE seat harness 10 min

Shoot silver (interior parts, propeller, mask/shoot wheel hubs) 15 min

Detail paint interior, assemble 30 min

Dull coat interior 15 min

Close up fuselage 15 min

Attach cowl over nose 10 min

Attach lower wings, stabilizers 30 min

Attach lower wing fairings 15 min

Assemble engine 30 min

Assemble cowl etc 30 min

Attach struts to upper wing ... dry-align … tape? 45 min

Attach landing gear 30 min

Fill seams, 20 min

Sand seams 45 min

Shoot primer 15 min

Shoot sand windshield cowl 15 min

Attach windscreen (mask) 30 min

Fair in windscreen, mask 30 min

Shoot white spinner (half), fuselage band) 15 min

Mask, shoot sand 15 min

Smoke rings 45 min

Mask; shoot underside gray 45 min

Unmask 15 min

Scotch-brite 30 min

Duracryl 15 min

Decaling 60 min (broken up over extended sessions)

Dull-coat 15 min

Attach upper wings 45 min

Dull-coat strut attachments etc 15 min

Rig 30 min

Touch up Dull-coat 15 min